Yifeng Steel Structure: Your Professional Overhead Line Tower Supplier!

As a professional factory and manufacturer with over 20 years of deep-rooted industry experience, we were established in 2005 and specialize in the R&D of power transmission towers, communication towers, and various types of steel structural towers.

Extensive Project Experience

Our products have been successfully deployed across a wide range of engineering sectors, including telecommunications, electric power, defense, and meteorology.

Advanced Production Lines

Equipped with cutting-edge machinery—including CNC laser cutters and fully automated angle steel processing lines—to ensure high-precision manufacturing.

End-to-End Production Capabilities

We possess integrated service capabilities encompassing design, manufacturing, installation, and maintenance.

Professional Customization

We provide personalized, one-on-one technical support to address specific requirements regarding dimensions, shapes, and functional specifications.

 

 
  • Overhead Transmission Line Tower
    Overhead transmission line towers are supporting structures used in power transmission systems and are widely used in power transmission line projects.
  • Transmission Overhead Line Towers
    Transmission Overhead Line Towers support high-voltage power lines, ensuring stable and efficient electrical transmission over long distances. They are commonly used in power grids, industrial power
  • Overhead Power Line Tower
    The Overhead Power Line Tower supports high-voltage transmission lines, ensuring reliable power distribution. It is commonly used in power transmission, substation connections, railway
 
Brief Introduction To Overhead Line Tower

 

An Overhead Line Tower is a steel lattice structure used for erecting power transmission lines, suitable for power grid construction and high-voltage transmission projects.

 

Technical Parameters
 

 

Welding

Standard

Standard Title

Pole shafts&multi-sided tubular

AWS D1.1/D1.1M:2010

Structural Welding Code-Steel

Cross arms&all accessories

Welding wire

AWS D1.1/D1.1M:2010

Structural Welding Code-Steel

 

Steel

Yield Strength(MPa)

Standard

Standard Title

Metallic element

Content

Main ingredient Q345

345 for Thickness<=16

GB/T 1591-2008

High strength low alloy structural steels

C

≤0.20

(ASTM A572/A572M-15 ,EN10025 S355N)

Mn

≤1.70

 

Si

≤0.50

Accessories Q235

235

GB/T 700-2006

Carbon structural steels

(ASTM A283 Gr.B ,EN10025 S235JR)

P

≤0.035

 

S

≤0.035

 

Grade

Thickness or diameter(mm)

Anti-push, bending and press strength(N/mm2)

Anti-shear strength (N/mm2)


Q235 Steel

≤16

215

125

>16~40

205

120

>40~60

200

115

>60~100

190

110

Q345 Steel

≤16

310

180

>16~35

295

170

>35~50

265

155

>50~100

250

145

Q420 Steel

≤16

380

220

>16~35

360

210

>35~50

340

195

>50~100

325

185

Q460 Steel

≤16

415

240

>16~35

395

230

>35~50

380

220

>50~100

360

210

 

Features of Overhead Line Tower
 
Overhead Transmission Line Tower best
 

High Load-Bearing Capacity

Constructed from Q235 or Q345 structural steel, the Overhead Line Tower is capable of stably supporting the weight of transmission conductors as well as wind loads exceeding 30 m/s, thereby ensuring the long-term safe operation of the transmission line.

 

Stable Truss Structure

Designed with a triangular or quadrangular truss configuration, the Overhead Line Tower distributes the tension from the conductors across multiple nodes, thereby maintaining the stability of the tower body within long-span transmission lines.

Overhead Transmission Line Tower
Overhead Transmission Line Tower suppliers
 

Long-Term Corrosion Resistance

The surface undergoes a hot-dip galvanizing treatment, effectively preventing corrosion caused by rain and atmospheric exposure, and ensuring a service life of over 30 years in outdoor environments.

 

High Installation Efficiency

Utilizing modular steel structural components, the tower is assembled via bolted connections; this approach minimizes the need for welding operations and significantly reduces on-site construction time.

Overhead Transmission Line Tower best

 

Quality Control
 
Overhead Transmission Line Tower

Raw Material Inspection
Prior to production, all steel materials are inspected for material grade, thickness, and chemical composition to ensure compliance with Q235 or Q345 standards.

 

Cutting Dimension Verification
After cutting, steel plates and structural steel sections are measured to verify dimensional accuracy, ensuring that all components meet the requirements specified in the design drawings.

 

Punching Precision Inspection
Upon completion of punching, hole diameters and spacing are inspected to guarantee accurate alignment and connection during component assembly.

 

Welding Quality Inspection
Welding procedures are executed in strict accordance with the AWS D1.1 standard to ensure uniform and robust weld seams.

 

Galvanization Quality Inspection
Following hot-dip galvanization, the surface uniformity and adhesion of the coating are inspected to ensure long-term corrosion resistance.

 

Finished Structure Inspection
Before shipment, the finished structure undergoes a final inspection to verify overall dimensions and component numbering.

 

Customization Capabilities
 

Item

Description

Tower Height

The height can be adjusted according to transmission line design and terrain conditions.

Tower Structure Type

Customizable tower structures such as suspension towers, angle towers, and tension towers.

Steel Material

Steel grades such as Q235, Q345, or higher-strength steel can be selected according to project requirements.

Corrosion Protection

Different thicknesses of hot-dip galvanizing or special anti-corrosion coatings can be customized.

Voltage Level

The structure can be designed for transmission lines ranging from 35kV to 500kV.

 

After-Sales Service

Technical Consulting Services

We provide recommendations on transmission tower selection and technical documentation support.

01

Installation Guidance Support

We provide installation drawings and construction guidance to assist project teams in completing tower assembly.

02

Spare Parts Supply

In the event of damaged or missing components, we supply the necessary replacement parts.

03

Project Technical Support

We provide structural design and technical recommendations for power grid projects.

04

Quality Assurance Services

We offer a limited-term quality warranty; for any quality-related issues, we provide repair or replacement services.

05

 

 

FAQ

 

Q: How to pay?

A: T/T: 30% deposit in advance, 70% balance before shipment. L/C at sight is accepted.

Q: Are you a manufacturer or trading company?

A: We are a professional manufacturer with our own factory.

Q: What is the delivery time?

A: 15–35 days depending on product type and order quantity.

Q: Can I visit your factory?

A: Yes, factory visits are warmly welcomed.

Q: What is your production capacity?

A: Around 60,000 tons annually with multiple production lines ensuring stable supply and fast delivery.

Q: How is an Overhead Line Tower installed?

A: Overhead Line Towers are assembled on-site by bolting together the various steel structural components.

Q: What components are included in an Overhead Line Tower?

A: Mainly includes the tower structure, crossarms, insulator connectors, and grounding wire supports.

Q: What packaging method is used for export?

A: Components are typically packaged using steel strapping and pallets.

Q: What is the minimum order quantity?

A: The minimum order quantity is typically 1 ton.

As one of the most professional overhead line tower manufacturers and suppliers in China, we offer a wide range of products with superior quality. Please feel free to buy cost-efficient overhead line tower for sale here from our factory. Contact us for more details.

Send Inquiry